Official KORAX Roadmap

From KRX infrastructureto a complete Web3 builder ecosystem.

The KORAX roadmap tracks the development of the KRX presale, claim, staking, flexible builder access, Token Builder AI, Website Builder AI, project registry, launch infrastructure, and future ecosystem expansion.

Real on-chain infrastructure
1,500 KRX builder access
Live AI creation tools
Connected registry and launch direction
KORAX official logoKORAX
KORAX Development System
Build • Connect • Expand
Presale
Live
Token Builder AI
Live
Website Builder AI
Live
Launch Infrastructure
Live
Access Requirement
1,500 KRX
Primary Network
BNB Chain
Roadmap Progress

Core infrastructure is already established.

KORAX has progressed beyond the concept stage. Presale infrastructure, flexible access, AI creation, Website Builder AI, and launch systems have already been built or prepared.

Built or Prepared
6 / 8
FoundationBuilder ToolsLaunchExpansion
01Established

Foundation

Token, presale, claim, staking, vault, and access infrastructure.

02Live

Creation

AI project strategy, token deployment, visuals, and website generation.

03Live

Launch

Project registry, public presentation, contribution, and launch systems.

04In Progress

Expansion

Project discovery, ecosystem adoption, liquidity, and market growth.

Development Timeline

Eight phases of KORAX development.

Statuses describe current technical progress. They do not guarantee future market performance, adoption, exchange listings, or delivery dates.

01
Phase 1

Core Infrastructure & KRX Presale

Live

The foundational KORAX token and presale infrastructure is active on BNB Chain.

01

KRX presale infrastructure deployed for BNB Smart Chain participation.

02

Five presale stages with progressive pricing from $0.05 to $0.13.

03

Support for BNB, USDT, and USDC participation where configured.

04

Presale purchases are recorded on-chain for the participating wallet.

05

Core infrastructure is separated across token, presale, vault, claim, and staking systems.

02
Phase 2

Claim & Staking Infrastructure

Prepared

Claim and staking systems are prepared for activation after the KRX presale lifecycle reaches the required stage.

01

Purchased KRX is prepared for release after presale completion and claim activation.

02

Claim infrastructure reads purchased, claimed, claimable, and vested balances on-chain.

03

The vesting structure supports four scheduled 25% releases.

04

Seven fixed-duration KRX staking plans are prepared.

05

Staking rewards are distributed from the fixed ecosystem allocation rather than unlimited inflationary minting.

03
Phase 3

Flexible Access Manager

Upgraded

KORAX builder access is controlled through flexible on-chain requirements connected with eligible long-term staking.

01

The Access Manager supports adjustable project-slot requirements.

02

Builder access is not permanently locked to an unchangeable hardcoded token amount.

03

The current project-slot requirement is 1,500 KRX.

04

The qualifying staking commitment uses the 12-month plan.

05

One eligible 1,500 KRX stake provides one project slot according to deployed contract logic.

04
Phase 4

Token Builder AI

Live

The KORAX AI builder transforms project ideas into structured Web3 project and token foundations.

01

AI-assisted project positioning, market analysis, utility direction, and project verdict.

02

Tokenomics suggestions, staking direction, launch logic, roadmap, and risk analysis.

03

AI project visual generation for branding and marketing direction.

04

Flexible token configuration including supply, mintability, burnability, and staking settings.

05

Eligible builders can deploy project token, vault, optional staking contract, and project records on-chain.

05
Phase 5

Launch Your Project

Live

KORAX launch infrastructure supports project creation, launch preparation, participation logic, and public project presentation.

01

Eligible creators can prepare projects through KORAX launch infrastructure.

02

Launch configuration can include supported payment assets and contribution controls.

03

Project participation can connect with KRX access requirements.

04

Public project information can be linked with KORAX registry infrastructure.

05

Launch workflows are designed to connect project creation with later claim and ecosystem visibility.

06
Phase 6

Website Builder AI

Live

Website Builder AI creates structured Web3 project websites from token, roadmap, staking, launch, and branding data.

01

Web3 website generation is available through the KORAX builder ecosystem.

02

Projects can generate hero sections, tokenomics, roadmap, utility, staking, and launch content.

03

Generated output can include deployment-ready project files.

04

Website data can connect with projects created through Token Builder AI.

05

GitHub publishing and project export workflows support faster deployment preparation.

07
Phase 7

Project Registry & Ecosystem Expansion

Expanding

KORAX is expanding from individual builder tools into a connected public ecosystem for created and launched projects.

01

Projects created through KORAX can connect with public registry infrastructure.

02

Project profiles can present token, vault, staking, owner, launch, and metadata information.

03

Registry visibility helps users discover projects created through the KORAX ecosystem.

04

Token Builder AI, Website Builder AI, Launch, and Registry data are being connected into one workflow.

05

Additional builder and discovery modules can be introduced as ecosystem usage grows.

08
Phase 8

Market Growth, Liquidity & Listings

Planned

Long-term market growth will follow infrastructure readiness, security, ecosystem adoption, and responsible liquidity preparation.

01

Liquidity and public trading preparation remain part of the long-term roadmap.

02

Exchange listings are future objectives and are not guaranteed.

03

Growth will focus on real ecosystem tools and builder adoption rather than only token promotion.

04

Market expansion will consider security, regulation, liquidity, and community development.

05

Infrastructure will continue to evolve according to technical priorities and ecosystem demand.

Future ecosystem phase
Current Achievements

What KORAX has already built.

These modules represent the current ecosystem foundation and builder functionality.

01Five-stage KRX presale infrastructure
02Verified and separated contract architecture
03Flexible Access Manager implementation
041,500 KRX project-slot requirement
05Token Builder AI project workflow
06AI visual generation
07On-chain AI project deployment
08Website Builder AI
09GitHub-ready website export
10Launch and registry infrastructure
Next Priorities

Where development continues next.

KORAX development will continue around ecosystem connection, performance, security, project discovery, post-presale activation, and responsible market expansion.

01

Complete ecosystem connection

Connect builder, website, registry, launch, and public project data through a more unified user workflow.

02

Improve mobile performance

Reduce heavy animations and processing overhead for builder tools on mobile devices.

03

Expand project discovery

Strengthen public project profiles, launch discovery, and registry visibility.

04

Security preparation

Continue contract testing, production reviews, deployment verification, and public transparency.

05

Presale completion workflow

Prepare final claim activation, staking availability, and ecosystem access after presale completion.

06

Market development

Approach liquidity, listings, partnerships, and market expansion after core ecosystem readiness.

Flexible Infrastructure

Builder access can evolve with the KRX ecosystem.

The Access Manager was designed so project requirements can remain adaptable instead of being permanently locked to a rigid amount. The current on-chain requirement is 1,500 KRX in the qualifying 12-month staking plan for one project slot.

Current Requirement
1,500 KRX
Qualifying Plan
12 Months
Current Access Result
One eligible stake → One project slot
KORAX Builder Ecosystem

Your path to the top begins with KORAX.

Follow the development roadmap, explore the working builder modules, and review the complete KORAX ecosystem documentation.

Roadmap notice: The KORAX roadmap describes current development direction and planned ecosystem priorities. Future features, timelines, exchange listings, liquidity events, integrations, and market objectives may change based on technical development, security reviews, regulation, market conditions, and ecosystem requirements.